Why sCO2?
Compare sCO2 with traditional solutions.
Residential sCO2
Residential Scenario
"Quiet, compact R744 heat pumps that retrofit fast without rebuilding your system."
Investment
€15k - €80k
Payback
5-8 Years
Commercial sCO2
Commercial Scenario
"Modular sCO2 clusters that cut OPEX and keep hotels, campuses, and chains compliant."
Investment
€150k - €1.2M
Payback
1-3 Years
Industrial sCO2
Industrial Scenario
"MW-scale waste-heat recovery where metallurgy, pressure testing, and ROI proof decide."
Investment
€1M - €10M+
Payback
3-5 Years
Technical Deepdive Matrix
Upstream and downstream hardware versus integrated sCO2, ranked by hub grade.
| Technical Specification | Upstream Materials | Downstream Hardware | Integrated Solutions | Hub Grade |
|---|---|---|---|---|
| Cycle Efficiency | N/A | 35% - 48% | Up to 52% | A+ |
| Operating Temperature | 1200°C+ | 50°C - 700°C | Ambient to 900°C | S |
| Footprint | Variable | Compact (1/10 Steam) | Modular sCO2 Skid | A |
| Typical Lead Time | 4-8 Weeks | 12-24 Weeks | 24-40 Weeks | B |
| Certification | ISO/AS9100 | CE/PED/UL | Turnkey Plant | S |
*Data based on 2025 industrial benchmarks from partner factories.
Operational Sovereignty
Custom engineering for 500°C - 1000°C recovery cycles requires high-temp nickel alloys.
Operational Sovereignty
Custom engineering for 500°C - 1000°C recovery cycles requires high-temp nickel alloys.
FOR Residential
Residential units focus on noise reduction and 'Plug-and-Play' integration.
Checklist
For Residential sCO2
- Low-noise indoor comfort for premium residences
- Retrofit-ready integration with existing hydronic loops
For Commercial sCO2
- Modular scaling from 100 kW to multi‑MW deployments
- CE/PED documentation package with commissioning support
For Industrial sCO2
- Verified GH4169/Inconel supply chain for high-temp duty
- On-site technical audit + ROI model for waste heat recovery
Ready to deploy sCO2?
Deploy integrated sCO2 systems with certified suppliers and turnkey support.